Flyer on the reporting obligation on the international Moselle as of 1 July 2021

Please note that this flyer is also available in Dutch: Dutch version in PDF format
Our brochure

Please note the new lock closure times on the Moselle.
The periods stated in the brochure are no longer valid!
Our flyer

Please note the new lock closure times on the Moselle.
The periods stated in the flyer are no longer valid!
Copyright © 2009 - The Moselle Commission‘s Administrative Office, Trier | legal information
News
09.07.2020
Film about the Moselle now available in English
In 2019, the Luxembourg Ministry of Mobility and Public Works published a film (in German) which presents the inland waterway Moselle and its infrastructure in the jointly m
[...more]
18.05.2020
Electronic reporting on the Moselle as of 1 July 2021
The Moselle Commission was obligated to postpone the introduction of the electronic reporting on the international Moselle.
The new regulation will be in force as of 1 July 2021.
[...more]
27.06.2017
Stability guide for inland navigation vessels carrying containers available
The Central Commission for the Navigation of the Rhine (CCNR) has published a practical guide on stability during container transport. You will find more information[...more]
Read more news in our news archive